some-alt
DTEK
About DTEK
Go to: About DTEK Mission, vision, values History Contact us Privacy policy
Supporting Ukraine #FightForLight Our people Cookie Policy Awards and recognitions
Our businesses
Go to: Our businesses DTEK ENERGY DTEK RENEWABLES DTEK OIL&GAS DTEK GRIDS DRI
MODUS X Academy DTEK D. TRADING D. SOLUTIONS
Sustainability
Go to: Sustainability Our sustainability journey Investing in green Environment Health and Safety
Governance People Policies Sustainability in Action
Investors
Go to: Investors Governance Sustainability Reports
News and Insights
Go to: News and Insights Media releases In the media Latest updates Image library Video library Contact us
Careers
Go to: Careers Vacancies
Toggle High Contrast
EN
UA
Home page News and Insights Media releases

Media releases

  • Home page
  • News and Insights
  • Media releases
  • DTEK Dobropilska CEP Saves 85% of Energy on Lighting
04 April 2018, Ukraine
DTEK Dobropilska CEP Saves 85% of Energy on Lighting
PDF version
Download
download
Subscribe to our news linkedin
DTEK Dobropilska CEP Saves 85% of Energy on Lighting

“Last year, DTEK ESCO already performed a project for us on technical re-equipment of our lighting system in the CEP main building. Replacement of 340 conventional lighting fixtures with LED ones and 6 km of cabling with new one resulted in over 90% economy on electric lighting and in three-fold improvement of lighting conditions at workplaces. This experience has inspired us to move further: there will be no more dark places at our enterprise. The plant workers’ labor must be safe,” said Nadiia Sudak, Director of DTEK Dobropilska CEP.

The significant changes are acclaimed by the plant workers.

Andzhela Kobets, Conveyor Machinist, DTEK Dobropilska CEP:

“Before the new lighting has been set, we had to use flashlights often for better overview and care of equipment. We are happy now that there’s no need for that any more. Thanks to new lighting ne can easily inspect any awkward places of a belt conveyor and do cleaning there. Now we have daylight at work levels which is crucial at dark hours.”

Nadiia Kiriienko, Conveyor Machinist, DTEK Dobropilska CEP:

“The new lamps in the bridge gallery No. 10 allow us to save energy while improving lighting quality. Fixtures installed before used to have short service life. We had to replace them almost every shift. Now, thanks to new LED lamps, I can be sure accepting my shift that I will be working all 12 hours in good light!”

“Electric lighting upgrades are beneficial in all aspects. We save power and money. Say, by replacing one 100 W incandescent fixture with a 15 W LED fixture we save 85 W of power. That’s 744.6 kWh annually. For every 1 kWh our enterprise pays 1.86 hryvnias. Hence, one LED fixture will be saving us 1,385 hryvnias per year.

Besides economy, we improve illuminance levels, hence, fewer accidents. We improve industrial safety: all new lamps are dust- and moisture-protected. LED lamps require no specific disposal like fluorescent ones do because of mercury content. The new lamps are long-lasting and will serve several years. Therefore, operational costs for replacement of lamps are reduced,” said Oleksandr Yarmolenko, Chief Power Engineer.

“We wanted to make the enterprise as bright as a day. But you cannot simply replace the lamps, do the so-called re-lamping. We approached the project comprehensively. We have completely redesigned the lighting system together with our contractors EA SOLUTIONS LLC and IntelTech Ukraine LLC: fixtures arrangement, light zones; internal power network loading was recalculated. As an energy service company we have funded 100% of project development and implementation costs. As a result, we have met the energy saving targets and improved comfort for the employees. We are implementing another similar project at DTEK Pavlogradska CCM: there will be 650 new LED fixtures there soon,” said Yevhen Bushma, Director of DTEK ESCO.

The project for overhaul of lighting at the conveyor galleries section at DTEK Dobropilska CEP has been implemented on terms of the 6-year energy service contract. During this period, the achieved savings will be split 75/25 between the ESCO investor and the customer. After expiration of the contract all new equipment and 100% of savings will be kept by the customer.

All news
All news
Ukraine’s DTEK to build €1.2 billion 650 MW windfarm in Poltava, strengthening energy system
21 April 2026
Ukraine’s DTEK to build €1.2 billion 650 MW windfarm in Poltava, strengthening ...
DTEK Grids shares bird protection experience at “Free Sky for Birds 2026”
16 April 2026
DTEK Grids shares bird protection experience at “Free Sky for Birds 2026”
Former US Ambassador to Ukraine Geoffrey Pyatt appointed as Chairman of DTEK Advisory Council
14 April 2026
Former US Ambassador to Ukraine Geoffrey Pyatt appointed as Chairman of DTEK ...
DTEK and Baker Hughes sign MOU to develop Ukraine's gas production and strengthen energy security
09 April 2026
DTEK and Baker Hughes sign MOU to develop Ukraine's gas production and strengthen ...
Stay Connected
Find press contacts, images, and information for the news media
E: pr@dtek.com
DTEK
About DTEK
Mission, vision, values History Contact us Privacy policy Supporting Ukraine #FightForLight Our people Cookie Policy
Our businesses
DTEK ENERGY DTEK RENEWABLES DTEK OIL&GAS DTEK GRIDS DRI MODUS X Academy DTEK D. TRADING D. SOLUTIONS
Sustainability
Our sustainability journey Policies and public statements Investing in green Environment Health and Safety Governance People Sustainability in Action
Investors
Governance Sustainability Reports
News and Insights
Media releases In the media Latest updates Image library Video library
Careers
Vacancies
Sitemap
DTEK 20th Anniversary
DTEK х Fluence BESS
Subscribe to DTEK
Stay up to date
DTEK
social media
DTEK CEO
on social media
2005-2026 DTEK
ALL RIGHTS RESERVED
Made by Frontmen, 2020
EN
UA
About DTEK
Mission, vision, values History Contact us Privacy policy Supporting Ukraine #FightForLight Our people Cookie Policy Awards and recognitions
Our businesses
DTEK ENERGY DTEK RENEWABLES DTEK OIL&GAS DTEK GRIDS DRI MODUS X Academy DTEK D. TRADING D. SOLUTIONS
Sustainability
Our sustainability journey Governance People Investing in green Environment Health and Safety Policies Sustainability in Action
Investors
Governance Sustainability Reports
News and Insights
Media releases In the media Latest updates Image library Video library Contact us
Careers
Vacancies
I confirm the foregoing Do not confirm