Zuevskaya TPP, start-up boiler house |
|
Full view
|
 |
Zuevskaya TPP, stack construction, May 1980 |
|
Full view
|
 |
Zuevskaya TPP, main building construction |
|
Full view
|
 |
Zuevskaya TPP, mazut pumping house construction |
|
Full view
|
 |
Zuevskaya TPP, cooling tower construction, 1979 |
|
Full view
|
 |
Zuevskaya TPP, main building construction |
|
Full view
|
 |
Zuevskaya TPP, helicopter dismantling the sliding forms of the stack, September 1981 |
|
Full view
|
 |
Zuevskaya TPP, cooling tower construction, September 1981 |
|
Full view
|
 |
Zuevskaya TPP, construction of the fuel conveying system |
|
Full view
|
 |
Zuevskaya TPP, construction of the fuel conveying system |
|
Full view
|
 |
Zuevskaya TPP, main building and fuel conveying system, October 1979 |
|
Full view
|
 |
Zuevskaya TPP, main building construction |
|
Full view
|
 |
Luganskaya TPP, transfer premises construction |
|
Full view
|
 |
Luganskaya TPP, strapping the turbine building column |
|
Full view
|
 |
Luganskaya TPP, gatehouse of Voroshilovgradskaya GRES |
|
Full view
|
 |
Luganskaya TPP, installation of reinforced foam concrete plates |
|
Full view
|
 |
Luganskaya TPP, construction of the fuel feeding gallery |
|
Full view
|
 |
Luganskaya TPP, car dump construction |
|
Full view
|
 |
Luganskaya TPP, Unit 12 construction, January 1964 |
|
Full view
|
 |
Luganskaya TPP, mounting the main building of the boiler section |
|
Full view
|
 |
Luganskaya TPP, fault detection of the unit’s low pressure cylinder blades |
|
Full view
|
 |
Luganskaya TPP, car dump and coal yard |
|
Full view
|
 |
Luganskaya TPP, installation of turbine units |
|
Full view
|
 |
Luganskaya TPP, closed circulating wasteway |
|
Full view
|
 |
Luganskaya TPP, concrete batching plant and temporary float bridge over the Severskiy Donets river |
|
Full view
|
 |
Luganskaya TPP, installation of turbine condensers |
|
Full view
|
 |
Luganskaya TPP, installation of the main building roof plates |
|
Full view
|
 |
Luganskaya TPP, installation of the force and drainage water circulation passages |
|
Full view
|
 |
Luganskaya TPP, installation of the induced draft section at the boiler workshop, 1955 |
|
Full view
|
 |
Luganskaya TPP, superstructure of the turbine foundation frame |
|
Full view
|
 |
Pavlogradugol. Installation of the mine technical complex, 1964 |
|
Full view
|
 |
Pavlogradugol. Constructing the mine, 1963 |
|
Full view
|
 |
Pavlogradugol. Mine main view, 1964-1965 |
|
Full view
|
 |
Pavlogradugol. First coal at Ternovskaya mine, 1959 |
|
Full view
|
 |
Pavlogradugol. Construction of the service shaft at Zapadno-Donbasskaya mine, 1972 |
|
Full view
|
 |
Pavlogradugol. Construction of the mainframe at Zapadno-Donbasskaya mine |
|
Full view
|
 |
Komsomolets Donbassa. 87 days left to mine commissioning. |
|
Full view
|
|