Ukrelektrosetstroy, a partner of DTEK, performs construction, reconstruction, technical re-equipment and major overhaul of high-voltage overhead transmission lines and construction works at 35-750 kV substations, mounting of lighting steel and reinforced-concrete masts 80 m high, as well as pulling the self-bearing insulated cables 0.4-10 kV.
Services of the Company:
- supply of materials, articles and equipment;
- transportation of the articles from supplier to a facility within Ukraine;
- excavation works;
- composite and monolithic reinforced concrete foundations;
- steel structures of steel supports for high-voltage lines 0.4-220 kV, steel cross bars for reinforced concrete supports and steel structures for substations;
- assembly and installation of all voltage classes of various designs;
- pulling the cable and lightning proof rope on all high-voltage lines;
- grounding circuits arrangement.
6 Shirokaya St., Artyomovsk,
Donetsk Region, 84500, Ukraine
Tel./fax: + 38 06274 312 40
Enter Ukrelektrosetstroy`s History Page